Cameroun, September 2004
![]() |
| Work has begun! |
![]() |
Working session in the training centre with Josianne and Thomas in the foreground.
Cameroun suffers from lack of cables, so all Internet connections are wireless via satellite.
![]() |
Thomas, Etienne and Joachim working with cases and discussing “whatever might happen. we must.”
![]() |
Yves, Josianne and Tresor working outside. That was possible in the middle of the day when it was normally cloudy (and sometimes raining).
![]() |
Working in groups inside. Because of high humidity working inside was very hot even for the local people.
Jeanne in the middle is trying to make the guys focus on the training;)
![]() |
| The sign arrives, paint still wet. |
![]() |
| From the closing ceremony. The participants have received their diplomas. The first ones from left are: Frank Bach (UNI-C), Tresor, Thomas and Guy. |
Contact
News
Sitemap
About
Technical






